E-
10
From factory the unit is supplied and set with a pre-charge of nitrogen gas
(insert gas). Therefore, all insert gas must be purged before connecting the
assembly piping.
Make sure all the nitrogen gas is purged out before installing the unit. If
not, do not install the unit because leftover nitrogen could cause internal
leakage.
Unscrew the pinch pipe at the end of each refrigerant pipe.
Result
: All inert gas escapes from the indoor unit.
Note
To prevent dirt or foreign objects from getting into the pipes
during installation, do NOT remove the pinch pipe completely until
you are ready to connect the piping.
Indoor unit installation(Continue)
The designs and shape are subject to
change according to the model.
Purging the unit
5
Making a hole on the wall.
6
The pipes & cable should be go through the bottom back hole.
7
Hanging the indoor unit on the Bracket Hanger, then fix the Indoor Unit by
using 4 Screws.
Case 1. Installing on the floor : Must fix 4 screws on the wall, make the
indoor not to fall down(For safety installation) .
Case 2. Hanging on the wall : Follow the installation guide supplied in the
accessory part.
Screw positions are specified on the installation guide.
Liquid refrigerant port
Gas refrigerant port
Ø60~65mm
Drain hose
less than 70mm
Inside room
Outsite room
75mm
FJM CONSOLE_IM_29317A_E_10.16.08.indd 10
2008-11-24 15:41:30