![Samsung iPolis SNM-128S User Manual Download Page 108](http://html.mh-extra.com/html/samsung/ipolis-snm-128s/ipolis-snm-128s_user-manual_354454108.webp)
User's Manual
107
The detailed information of a scheduled backup is displayed in the Backup Operation Status
table.
Available information includes "Schedule," "Unit Name," "Backup," "Drive," "Filename,"
"Progress," "Starting Time," "Ending Time," and "Results".
If a backup operation is in progress, the backup operation is displayed as "Backing up..." under
the [Backup] category. You can check the progress of the backup under the [Progress (%)] and
[Size (MB)] categories.
Pending backups are displayed as [Ready] and completed operations as [Completed].
5.2.2 Viewing Detailed Information
To check backup details, select a schedule and then click the [Details] button.
"Detailed Backup History" displays backup files and their sizes in MB.
5.2.3 Aborting Backups
To abort a backup, select the schedule and then click the [Abort] button.
When a backup is aborted, the Backup program finalizes the backup file at the point that it was
aborted.
The [Abort] button is enabled only when a backup is running and selected.