
ENGLISH-62
Electrical wiring work
3 phase 3 wires 208~230 V [AM
✴✴✴
HXWAF
✴
] / 3 phase 3 wires 460 V [AM
✴✴✴
HXWAJ
✴
]
3 phase 3 wires 208 ~ 230 V [AM
✴✴✴
HXWAF
✴
]
3 phase 3 wires 460 V [AM
✴✴✴
HXWAJ
✴
]
Communication cable
(Outdoor unit ~ Outdoor unit)
Main outdoor unit
Sub outdoor unit 1
Sub outdoor unit 2
Communication cable
(Outdoor unit ~ Indoor unit)
❋
Grounding
Wired remote
controller
Wired remote
controller
Wired remote
controller
MCCB+
ELB
or
ELCB
MCCB+
ELB
or
ELCB
MCCB+
ELB
or
ELCB
1 phase 2 wires
(208 -230 V)
MCCB+
ELB
or
ELCB
Main outdoor unit
Sub outdoor unit
Communication cable
(Outdoor unit ~ Indoor unit )
Communication cable
(Outdoor unit ~ Outdoor unit )
f
Connect a power cable of the outdoor unit after checking that R-S-T (3 phase 3 wire) is properly connected.
f
Communication cable between indoor and outdoor units and communication cable between outdoor units has no
polarity.
f
Arrange the cables with a cable tie.
❋
ELCB and ELB must be installed since there is risk of electric shock or fire when they are not installed.
k}tGzG~Tnlvptluki]_TW[^``hTWZUGGG]Y
YWX]TW^TYXGGG㝘䟸GXaWYaWY