42
Total
dimensions
a
ab
bo
ov
ve
e
the work
top
Total
dimensions
b
be
ello
ow
w
the work
toptravail
Width
58 cm
55.4 cm
Depth
52.2 cm
47.4 cm
Thickness
4.9 cm
3.5 cm
1
1 // INSTALLING YOUR APPLIANCE
•
•
PROPER POSITIONING
Your appliance shoud be built in the surface of
a support cabinet that is a minimum of 3 cm
thick, made of a material that resists heat or
that is covered with such a material.
So as not to disturb movement of cooking
utensils, there should not be to the right or left
or back any obstacle within 30 cm of the hob.
If a horizontal divider wall is positioned under
the hob, it should be placed between 10 cm
and 15 cm away from the top of the work top.
In any event, do not store aerosol cans or
containers under pressure in any
compartment that may exist under the hob
(See "Safety Recommendations" chapter).
FLUSH MOUNTING
Follow the diagram
(Fig. 01).
— Remove the pan supports, the burner covers
and burner heads; noting their positions.
— Turn the hob over and carefully place it on
top of the opening in the cabinet so as not to
damage the knobs and spark plugs.
— To ensure a tight seal between the housing
and the work top, glue the foam seal a
allo
on
ng
g
tth
he
e e
ex
xtte
erriio
orr e
ed
dg
ge
e o
off tth
he
e h
ho
ou
us
siin
ng
g before
installing the hob
(Fig. 02).
•
•
48 cm mini
3 cm mini
30 cm mini
56 cm
30 cm mini
5,8 cm mini
70 cm mini
Fig. 01
Fig. 02
Housing
Seal
APPLIANCE
70 cm min
30 cm min
30 cm min
3 cm min
5.8 cm min
48 cm
m
in
99640621_A_ML.qxp 06/09/2006 09:47 Page 42