© 20
20
Samsung All rights reserved.
Once all equipment is communicating and auto
piping has successfully completed. UP will be
displayed on the main PCB.
Before entering auto trial operation:
• All option settings should be made through the
outdoor PCB and S-Net.
• Verify that the proper charge has been added
and the service valves are fully open.
To enter Auto Trial Operation
• Press and hold K1 for 5 seconds.
• The display will change to “K”“K”.
• Once successfully completing Auto Trial the
system will stop operation and the display will
begin to scroll connected equipment
addressing.
UP Un-Prepared
23
K1
K2
K3
K4