
Installation
English
23
Installation checklist
•
The dryer is plugged into a properly grounded outlet.
•
All packaging material is completely removed and properly disposed.
•
The dryer is level and standing firmly on the floor.
•
The long drain hose is installed if you want water captured by the drying process
drained automatically.
•
Start the dryer to make sure that it runs, heats, and shuts off.
•
Run a
TIME DRY
cycle for 20 minutes to see if the
HC
information code is displayed. If
this is the case, contact a local service center.
•
After installation, we recommend that you wait at least 1 hour before using the dryer.
Before using the dryer
•
Make sure no accessory remains inside the drum.
•
Plug in the power cord just before operating the dryer.
•
Do not block the air inlet hole of the cooling grill at the front of the dryer.
•
Do not place flammable objects near the dryer and keep the surrounding area clean.
•
Keep the dryer level with the ground.
•
Do not remove the adjustable levelling legs of the dryer. They are necessary to keep
the dryer level.
DV6850N_DC68-03650E-03_EN.indd 23
2018/11/29 11:19:52