25
English
Installation
Installation Inspection
Step 4.1 Performing the gas leak tests
1
Before inspecting the leakage, use a torque
wrench to close the cap for the stop valve. (Comply
with a tightening torque for each size of the
diameter, and tighten the cap firmly to prevent
any leakage.)
2
Insert inert gas into the pipes connected to indoor
and outdoor units.
3
Test leakage on the connection parts of the indoor
and outdoor units with soap lather or liquid.
Step 4.2 Running the Smart Install
mode
1
Make sure that the air conditioner is in the standby
status.
2
Hold down the (Power), (Mode), and
(SET) buttons on the remote control
simultaneously for 4 seconds.
3
Wait until Smart Install mode succeeds or fails. It
takes approximately 7 to 13 minutes.
•
While Smart Install mode is proceeding:
Type
Display
LED Display
Indoor
unit
indicator
LED1
LED2
LED3
The progress is
displayed as a
number between
0 and 99 on
the indoor unit
display.
The LEDs on the
indoor unit display
blink in sequence,
then all of them
blink simultaneously.
These operations
repeat.
•
When Smart Install mode succeeds: Smart
Install mode ends with ringing sound, and the
air conditioner is in standby status.
•
When Smart Install mode fails: An error
message is displayed on the indoor unit display,
and Smart Install mode ends.
NOTE
•
Smart Install mode can be operated only with the
supplied remote control.
•
During the Smart install mode procedure, remote
control cannot be operated.
Outer diameter
(mm)
Tightening torque
Body cap (N•m) Charging port cap (N•m)
ø 6.35
20 to 25
10 to 12
ø 9.52
20 to 25
ø 12.70
25 to 30
ø 15.88
30 to 35
Over ø 19.05
35 to 40
( 1 N•m = 10 kgf•cm )
Tightening torque for body
cap (Refer to the table)
Charging core
Spindle
R-22: Thread of the screw - 7/16-2OUNF
R-410A/R-32 : Thread of the screw -1/2-2OUNF
Tightening torque for charging port cap (Refer to the table)
Test parts for the
indoor unit
Test parts for the
indoor unit