ENGLISH-48
Completing the installation
f
Check the following after completing the installation.
Installation
Outdoor unit
• Check the external surface and the inside of the outdoor unit.
• Is there any possibility of short circuit?
• Is the place well-ventilated and ensures space for service?
• Is the outdoor unit fixed securely?
Indoor unit
• Check the external surface and the inside of the indoor unit.
• Is the place well-ventilated and ensures space for service?
• Check if the center of the indoor unit is ensured and it is installed horizontally.
Adding refrigerant
• Are the length and the difference between the refrigerant pipes within the allowable
range?
• Is the pipe properly insulated?
• Is the quantity of the additional refrigerant correctly weighed in?
Installing the drain pipe
• Check the drain pipe of the outdoor unit and the indoor unit.
• Have you completed the drain test?
• Is the drain pipe properly insulated?
Installing the wiring
• Have you performed the earthing work 3 to the outdoor unit?
• Is 2-core cable used?
• Is the length of the wire is in the limited range?
• Is the wiring route correct?