13
Ins
tallation Pr
oc
edur
e
English
Pipe
Pipe size
Insulation type (heating/cooling)
Remarks
Standard
(Less than 30°C, 85%)
High humidity
(Over 30°C, 85%)
EPDM, NBR
Liquid pipe
Ø6.35 to Ø9.52
9t
9t
The internal
temperature is
higher than 120°C.
Ø12.7 to Ø19.05
13t
13t
Gas pipe
Ø6.35
13t
19t
Ø9.52
19t
25t
Ø12.70
Ø15.88
Ø19.05
ŷ
When installing insulation in the places and
conditions below, use the same insulation that is
used for high humidity conditions.
<Geological condition>
High humidity locations such as shorelines, hot
springs, lake or riversides, and ridges (when part of
the building is covered by earth and sand)
<Operation purpose condition>
Restaurant ceiling, sauna, swimming pool etc.
<Building construction condition>
Ceilings frequently exposed to moisture and cooling
are not covered. For example, pipes installed at a
corridor of a dormitory and studio or near an exit
that opens and closes frequently.
Places (where the pipes are installed) that are highly
humid due to a lack of ventilation.
Step 10 Installing the drain hose and
drain pipe
1
Push the supplied drain hose as far as possible over
the drain socket.
2
Tighten the metal clamp as shown in the picture.
3
Wrap the supplied large sealing pad over the metal
clamp and drain hose to insulate and fix it with
clamps.
4
Insulate the complete drain piping inside the building
(field supply).
If the drain hose cannot be sufficiently set on a slope,
fit the hose with drain raising piping (field supply).