62
English
Check lists after completing the installation
INST
ALLA
TION P
A
R
TS
After completing the installation, you must check the following.
Installation
Indoor
unit
• Have you checked the external surface and the internal part of the indoor
unit?
• Is the place well-ventilated and ensures space for service?
• Have you checked if the center of the indoor unit is ensured and it is
installed horizontally in level?
• Have you connected refrigeration pipes properly?
Outdoor
unit
• Have you checked the external surface and the internal part of the
outdoor unit?
• Is there any possibility of short circuit due to the heat of an outdoor unit?
• Is the place well-ventilated and ensures space for service?
• Is the outdoor unit fixed securely?
Refrigerant pipe work
• Have you checked for any gas leakage?
• Are the length and the height difference between the refrigerant pipes
within the allowable range?
• Have you properly insulated pipes?
• Is the quantity of the additional refrigerant correctly weighed in?
• You must record the amount of additional refrigerant charging on the
service record label placed outside the outdoor unit.
Installing the drain pipe
• Have you completed the drain test?
• Is the drainpipe properly insulated?
Wiring work
• Have you checked for interference between the power and the
communication cable?
• Have you performed the earthing work 3 to the outdoor unit?
• Is the length of the wire within allowable range?
• Is the wiring route correct?
• Have you used verified power supply cable and the communication
cable?
Option
• Check whether the vibration-resistance frame is correctly installed if
there is a possible vibration of the outdoor unit.