3
.
Installing the Product
English 8/2020. Rev 0.3
13
Table 3-1: Estimated time for installation (based on 136S 3P installation)
No.
Step
Estimated Time
(HH:MM)
Aggregated Time
(HH:MM)
1
Unpacking
00:30
00:30
2
Inspection
01:00
01:30
3
Rack Anchoring
04:00
05:30
4
Rack Installation
Battery Module
00:20
05:50
SMU
00:10
06:00
SMPS Assembly
00:10
06:10
Rack Fuse Assembly
00:30
06:40
Busbar
01:00
07:40
Signal Cables
00:20
08:00
Power and Control Cables
00:20
08:20
AC Input Installation
00:20
08:40
Cable Installation
00:10
08:50
BMS Configuration
00:10
09:00
Summary of Contents for 93PM
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 136S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...Memo ...
Page 129: ...www SamsungSDI com ...