3
.
Installing the Product
12
English 8/2020. Rev 0.3
3.3
Installation Procedure
This product must be installed by following the procedure below:
Figure 3-1: Installation Procedure
Preparation Stage
Procedure
Unpacking
Ground Wire and Tools
Recommended Tools/Instruments
Appearance Inspection
Rack Anchoring Stage
Transport the rack frame to the installation location after unpacking
Arrange the rack frame after checking the positions of holes in the frame and anchoring points
Perform the anchoring and ground connections
Rack Installation Stage
Transport the battery modules to the installation location
Insert the SMU in the rack frame
Insert the SMPS Assembly in the rack frame
After all components are inserted in the rack frame, attach them to the rack frame
Place the battery modules in the rack frame
Connect the busbars
Connect the signal cables from SMU to module, and module to module
Connect the signal cables from SMU to SMU
System Installation Stage
Connect the SMPS Assembly to AC power source
Prepare the items for BMS configuration
Configure the BMS
Perform installation checks
Estimated time for each step is listed below.
1. Preparation
Stage
2. Rack Anchoring
Stage
3. Rack
Installation
Stage
4. System
Installation Stage
Summary of Contents for 9395
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 136S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...Memo ...
Page 129: ...www SamsungSDI com ...