
3
.
Installing the Product
82
English 8/2020. Rev 0.3
6.
Connect the signal cable “WIRE ASSY MODULE TO MODULE #1" from Module #5 “Left Connector” to
Module #6“Right Connector”.
Figure 3-98: Module #5 to Module #6 Signal Cabling
7.
Connect the signal cable “WIRE ASSY MODULE TO MODULE #1" from Module #6 “Left Connector” to
Module #7 “Right Connector.”
Figure 3-99: Module #6 to Module #7 Signal Cabling
Summary of Contents for 9395
Page 1: ...English 8 2020 Rev 0 3 LIB System for UPS U6A4 Installation Manual 136S ...
Page 4: ...English 8 2020 Rev 0 3 ...
Page 10: ...Important Safety Instructions vi English 8 2020 Rev 0 3 ...
Page 17: ...Table of Contents English 8 2020 Rev 0 3 vii ...
Page 18: ......
Page 126: ...Memo ...
Page 127: ...Memo ...
Page 128: ...Memo ...
Page 129: ...www SamsungSDI com ...