Start-up
Before start-up or putting the valve back into
service, make sure the following conditions
are met:
−
The valve is properly installed into the
pipeline (see the 'Installation' section).
−
The leak and function tests have been
completed successfully (see the 'Testing
the installed valve' section).
−
The prevailing conditions in the plant
section concerned meet the valve sizing
requirements (see information under 'In
-
tended use' in the 'Safety instructions
and measures' section).
Start-up/putting the regulator back into op
-
eration
1. Allow the valve to cool down or warm up
to reach ambient temperature before
start-up when the ambient temperature
and process medium temperature differ
greatly or the medium properties require
such a measure.
2. Slowly open the shut-off valves in the
pipeline. Slowly opening these valves
prevents a sudden surge in pressure and
resulting high velocities that can damage
the valve.
3. Check the valve to ensure it functions
properly.
Summary of Contents for 3595
Page 12: ...1 8 EB 8079 EN...
Page 32: ...4 6 EB 8079 EN...
Page 48: ...8 4 EB 8079 EN...
Page 58: ...9 10 EB 8079 EN...
Page 59: ...EB 8079 EN 9 11...
Page 60: ...9 12 EB 8079 EN...
Page 66: ...12 2 EB 8079 EN...
Page 68: ...13 2 EB 8079 EN...
Page 70: ...14 2 EB 8079 EN...
Page 74: ...15 4 EB 8079 EN...
Page 75: ......