5-4
EB 8026 EN
Installation
5.2
Preparation for installation
Before installation, make sure the following
conditions are met:
−
The valve is clean.
−
The valve and all valve accessories (in-
cluding piping) are not damaged.
−
The valve data on the nameplate (type
designation, valve size, material, pres-
sure rating and temperature range)
match the plant conditions (size and
pressure rating of the pipeline, medium
temperature etc.). See the 'Markings on
the device' section for nameplate details.
−
The requested or required additional
pipe fittings (see the 'Additional fittings'
section) have been installed or prepared
as necessary before installing the valve.
Risk of control valve damage due to incor-
rect insulation.
Î
Only insulate control valves with insulat-
ing section or bellows seal up to the bon-
net flange of the valve body for medium
temperatures below 0 °C (32 °F) and
above 220 °C (428 °F). If the insulating
section is insulated, it will not function
properly.
Î
Do not insulate valves mounted to com-
ply with NACE MR0175 requirements
and which have nuts and bolts that are
not suitable for sour gas environments.
Proceed as follows:
Î
Lay out the necessary material and tools
to have them ready during installation
work.
Î
Flush the pipelines.
The plant operator is responsible for clean-
ing the pipelines in the plant.
Î
For steam applications, dry the pipelines.
Moisture will damage the inside of the
valve.
Î
Check any mounted pressure gauges to
make sure they function properly.
Î
When the valve and actuator are al-
ready assembled, check the tightening
torques of the bolted joints (
u
Components may loosen during trans-
port.
5.3 Installing the device
The activities listed below are necessary to
install the valve and before it can be started
up.
Risk of valve damage due to excessively
high or low tightening torques.
Observe the specified torques when tighten-
ing control valve components. Excessive
tightening torques lead to parts wearing out
more quickly. Parts that are too loose may
cause leakage.
Î
Observe the specified tightening torques
(
u
NOTICE
!
Note
NOTICE
!
Summary of Contents for 3244
Page 25: ...EB 8026 EN 4 5 Shipment and on site transport...
Page 26: ...4 6 EB 8026 EN...
Page 51: ...EB 8026 EN 9 11 Servicing...
Page 52: ...9 12 EB 8026 EN...
Page 58: ...12 2 EB 8026 EN...
Page 60: ...13 2 EB 8026 EN...
Page 64: ...14 4 EB 8026 EN...
Page 65: ...EB 8026 EN 14 5...
Page 66: ...14 6 EB 8026 EN...
Page 68: ...15 2 EB 8026 EN 81 25 84 83 82 80 32 2 11 12 16 8 10 9 15 7 39 30 33 14 21 23 81 26...
Page 71: ......