Malfunctions
8.2
Emergency action
Plant operators are responsible for emergen-
cy action to be taken in the plant.
We recommend removing the regulator from
the pipeline before repairing it.
In the event of a regulator malfunction:
1.
Close the shut-off valves upstream and
downstream of the regulator to stop the
process medium from flowing through
the regulator.
2. Perform troubleshooting (see sec-
3. Rectify those malfunctions that can be
remedied based on the instructions pro-
vided here. Contact SAMSON's Af
-
ter-sales Service in all other cases.
Putting the regulator back into operation
after a malfunction
See the 'Start-up' section.