![SAMSGAZEBOS 10-OCT-E Assembly Instructions Manual Download Page 13](http://html1.mh-extra.com/html/samsgazebos/10-oct-e/10-oct-e_assembly-instructions-manual_805517013.webp)
13
37. Start installing the posts. It is crucial that you install the
right posts to the correct labeled corner.
1
1
41. Set the post aside and drill for the 3/8” wedge anchor
approximately 1-1/2” deep where you marked.
38. Let the bolt of the post base slip into the hole.
39. Align the diagonal pencil line to the center of the post
base.
Outside
Outside
40. AMach an “L” post connector to the post and mark for a
wedge anchor.
42. Put the post and the L post connector back where they
were and drill a 1/8” ~ 3/16” hole for a 3/8” lag bolt.
Outside
Inside
Outside
For your safety, another
person should hold the
posts while you are
drilling for lag bolts.