25. Label the post, headers, and the corners “2”. Labeling
them is the best way to avoid confusion.
26. Go to the next corner and repeat steps 17~ 24 for posts
3 ~ 8, and label each post in the sequenal numerical order.
29. Drill a 3/8” hole into each corner into the cement to mark
for the post base.
27. A good way to keep tack of marks is to rotate the leveling
wood piece as you level.
28. Now the seven posts are adjusted, post bases are fastened,
and ready to install.
30. Repeat step 29 for the other seven posts.