Doc.-ID: 220518-PT20BAU-SS-Ex Installation Manual rev.01.docx, Page 11 of 24
6
Commissioning
6.1
Installation
For the
luminaires’ installation and operation, the relevant national regulations, as well as
the generally accepted rules of technology shall prevail. Before mounting the lighting fix-
ture, thoroughly check it for any transport damage, especially at the housing and cable.
Installation, electrical connection and the first commissioning must only be carried out by
qualified personnel.
Attention!
Prior to the
luminair’s installation, take external sources of heat or cold
into account! Observe the permissible temperature range!
Attention!
The erection regulations defined in IEC 60079-14 shall apply!
Attention!
If you use the liteServer
®
in the mining sector with a “high” risk of me-
chanical hazard, you must provide an appropriate device ensuring pro-
tection of translucent parts (accessories)
6.1.1
Types from T20-VA1.1 to VA2.2
For illuminating of plants and/or persons, the luminaire can be mounted on swivelling
mounts (accessories). For this purpose, the mounting pin, welded to the bottom of the
lighting body dispose of holes with either 6.5 mm or 8.5 mm. The wall bracket is available
in different sizes and can be mounted in any position via four holes (see Figure 6-1
left
).