Assambly instruction Cooking station
4.
Installing the connection between top and base units
This work is only necessary if the top and base units were separated.
4.1
Opening the cooking station
4.1.1
Opening the operating panel
Screw M4x10, hexagon socket
WAF 2.5 mm, art. no. 02221807
Screw M6x35, hexagon socket
WAF 4 mm, art. no. 782629
Opening
.
Remove the gas knob (not the electric
knob).
.
Remove the gas tap lever, water supply
lever.
.
Remove M4 and M6 screws.
.
Lift up the operating panel and pull for
wards.
.
Fold down the operating panel.
Closing
.
Install the side section (chapter 4.1.2).
.
Fold up the operating panel.
.
Slide in the operating panel.
.
Insert all screws, then tighten them.
.
Install the gas knob.
.
Install the gas tap and water supply lever.
4.1.2
Removing the side panel
Screw M5x10,
cross-head, art.
no. 014154
Do not release/
removethe bottom
screws!
D
The side panel attaches at the bottom.
D
Do not release/ remove the screws at the
bottom, otherwise the support plate co
mes off.
.
Open the operating panel, see page 39
chapter 4.1.1
.
Remove the four screws at the side.
.
Swivel out the side panel at the top, lift it
up and remove it.