SALVA INDUSTRIAL, S.A
Horno Sirocco 00 Gas-Gasoil 50-60Hz (ing)121206.doc
1-11
The installed burner should have a voltage of
230 V, 50 Hz
and should be equipped with an
ionisation flame control system, timers and a gas pre-purge system which is triggered
automatically when the ignition button is pressed, delaying the functioning of the burner until the
pre-purge operation has been carried out.
The maximum working field of the burner depends on the counter-pressure in the combustion
chamber.
1.8 CHIMNEY
The oven needs to have
TWO INDEPENDENT CHIMNEYS
for a proper installation, one in order to
allow the exhaust gases coming out, and a fumes damper, in order to allow the fumes coming out
from the baking chamber.
The installation of the chimneys should be carried out by authorized professionals according to each
country regulations.
Fundamental aspects for the installation:
A.-
The top of the chimney must
be, at least,
1 meter (3 ft)
higher
than the upper part of the roof. Or
than any other obstacle within
10
meters (30 ft)
distance.
B.-
If you want a hood on the top of
the chimney, this must be made
with the same diameter as the
chimneys damper. And a cone
must be placed inside the hood to
make the fumes draft easier.
C.-
The chimney should incorporate
a system for preventing backflow of
condensates.
D.-
Sections should not be horizontal, but should instead have a slope of at least
10º.
E.-
Bends or elbows of radius less than twice the tube diameter should not be made.
Summary of Contents for SIROCCO 2000
Page 2: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 23: ...SALVA INDUSTRIAL S A Horno Sirocco 00 Gas Gasoil 50 60Hz ing 121206 doc 1 15 FIG 2...
Page 31: ...6 ELECTRICAL SCHEMES...
Page 32: ......
Page 33: ......
Page 39: ......
Page 41: ......
Page 43: ......
Page 44: ......