MD22 INSTRUCTION MANUAL
8
Important – Before carrying out
any servicing work, turn off
electrical supply to the boiler and
let the water cool down to a safe
working temperature. Using the
Mag Defender spanner provided
turn both isolation valves to the
OFF position.
Using the Mag Defender spanner
provided, carefully unscrew the lid.
SERVICING
1
2
MAG Defender Manual 013_Layout 1 28/02/2013 15:58 Page 9