SALONPRO Multi-Zone Hair Color Processor User Manual Download Page 4

Setting up and attaching the Floor Stand

i.  Screw the four wheels/casters into the 

threaded locations on the base, and 
tighten with the wrench (supplied).

i.  Insert the mounting bolt with washer 

(provided) through the bottom of the 
Base  and screw it into the Main Post 
section.

i.  On the Main Post, loosen the Height 

Adjustment Knob enough to insert the 
upper Extension Tube.

i.  Tighten the Adjustment Knob. 

2

•  Lower the Dryer onto the Stand 

assembly as shown.

Assembly and Installation 

Adjustment knob

Extension Tube

Main Post

Base

Mounting 

Bolt

Wall mounting requires first anchoring the 
Mounting Bracket to a suitable wall surface.  
The screws and anchor-bolts supplied are 
intended for use in brick, block, or concrete 
walls.  For mounting on walls using studs and 
drywall construction, it may be necessary to add 
structural backing, or additional framing before 
proceeding.  It is also important to verify the 
suitability of all hangers, bolts, and screws for 
any particular installation.  

We strongly advise 

consulting a licensed professional before pro-

ceeding.

Mounting the Wall Bracket

1

•  Verify that the wall is well-built and strong 

enough to carry the load of the bracket and 
dryer.

•  A grounded power outlet (110V/11A) must 

be available within 2 feet of the installation.  
Using a circuit with ground-fault-protection 
is recommended.

•  The recommended installation height is 6 ft 

(1.8m) above floor level, or as required.

Warning: 

This unit requires professional installation by a licensed contractor.

 

Improper installation may result in serious injury or death. 

SALON

PRO

 

will not be held liable for improper installation of our products. 

Brick or Block

Drill 3/8in holes

Mounting Bracket

Bolt, nut, lock-washer, wash-

er and expansion sleeve

Setting up and attaching the Swing Arm

Summary of Contents for Multi-Zone Hair Color Processor

Page 1: ...Multi Zone Infrared Hair Color Processor Dryer User Manual...

Page 2: ...unting should always be performed by a licensed professional Pay special attention the structural suitability of the mounting surface before proceeding Warning Always keep the dryer free of direct con...

Page 3: ...to begin operation Press the main START STOP button 11 again to halt operation Important Always keep client s hair and head at least 4 8 inches 10 20 cm from Heater Lamps Always keep the client s hea...

Page 4: ...t may be necessary to add structural backing or additional framing before proceeding It is also important to verify the suitability of all hangers bolts and screws for any particular installation We s...

Page 5: ...nuts in that order Tighten with a wrench to an appropriate 4 5 1 2 3 2 To attach the Dryer i Remove the small Phillips lock screw above the release ring 1 ii Hold the Dryer in place and on the attach...

Page 6: ...ve screws and cover at 1 Using a wrench loosen the locking nut To reduce height limit turn the adjustment screw anti clockwise To increase turn clockwise Tighten locking nut Replace the cover and reta...

Page 7: ...ly prohibited under the terms and conditions of its use Use limitation You may not modify copy distribute transmit display perform reproduce publish license create derivative works from transfer or se...

Page 8: ...C with respect to the products If any part of this disclaimer is determined to be void invalid unenforceable or illegal including but not limited to the warranty disclaimers and liability disclaimers...

Reviews: