![SALONPRO Multi-Zone Hair Color Processor User Manual Download Page 4](http://html1.mh-extra.com/html/salonpro/multi-zone-hair-color-processor/multi-zone-hair-color-processor_user-manual_3582075004.webp)
Setting up and attaching the Floor Stand
1
i. Screw the four wheels/casters into the
threaded locations on the base, and
tighten with the wrench (supplied).
i. Insert the mounting bolt with washer
(provided) through the bottom of the
Base and screw it into the Main Post
section.
i. On the Main Post, loosen the Height
Adjustment Knob enough to insert the
upper Extension Tube.
i. Tighten the Adjustment Knob.
2
• Lower the Dryer onto the Stand
assembly as shown.
Assembly and Installation
Adjustment knob
Extension Tube
Main Post
Base
Mounting
Bolt
Wall mounting requires first anchoring the
Mounting Bracket to a suitable wall surface.
The screws and anchor-bolts supplied are
intended for use in brick, block, or concrete
walls. For mounting on walls using studs and
drywall construction, it may be necessary to add
structural backing, or additional framing before
proceeding. It is also important to verify the
suitability of all hangers, bolts, and screws for
any particular installation.
We strongly advise
consulting a licensed professional before pro-
ceeding.
Mounting the Wall Bracket
1
• Verify that the wall is well-built and strong
enough to carry the load of the bracket and
dryer.
• A grounded power outlet (110V/11A) must
be available within 2 feet of the installation.
Using a circuit with ground-fault-protection
is recommended.
• The recommended installation height is 6 ft
(1.8m) above floor level, or as required.
Warning:
This unit requires professional installation by a licensed contractor.
Improper installation may result in serious injury or death.
SALON
PRO
will not be held liable for improper installation of our products.
Brick or Block
Drill 3/8in holes
Mounting Bracket
Bolt, nut, lock-washer, wash-
er and expansion sleeve
Setting up and attaching the Swing Arm