Salamander Pumps CTFORCEU Manual Download Page 2

30 

29 

19 

15 

26 

18 

12 

20 

21 

SKELECT07 

SERVICE INSTRUCTIONS:

 

10 

CT

BATHROOM

  

motor

 

end 

CT

FORCE

 

motor

 

end 

Motor live (light brown) 
Mounting hole 
Mains live (Brown) 
Mains Neutral (Blue) 
 
Left Hall effect 
Right Hall effect 
Pressure switch 

24 

25 

1. Remove Non Return Valve (NRV) (3 ) noticing its orientation using long nosed pliers and discard. 
2. Remove float (26) noticing its orientation. Discard. 
3. Remove pressure vessel(24) and vessel washer (25) 
4. Remove Junction box  (JB) box lid screws (8) using PZ2 driver and discard. 
5. Repeat above steps for opposite pump side. 
6. Remove JB lid (4) and retain. 
7. Disconnect Hall Effect sensor (19) "HE" lead  from PCB(15) 
8. Snip cable tie that secures HE lead loom. 
9. Remove 3 off M6 Cap Screws (21) and spring washers(20) and discard. 
10. Using a 7mm  OE Spanner push in Carstick 6mm bi pass tube (10)  retaining ring  and remove Pinlet 
(12) leaving bi pass connected to the manifold (5) 
11. Remove HE (19) from its housing (23) noting position 
12. Remove and discard black O ring (18). 
13. Fit new BLUE BOR (18) ensuring it’s not rolled and is flush. Engage Pinlet carstik (12) onto bi pass 
tube and press into place ensuring level, O ring is sealed and HE sensor is secure in its housing. 
14  Fit 3 off new spring washer (20) and M6 cap screw (21) and secure in clockwise stages to 2.3Nm 
max. M6 allen wrench. 
15. Repeat for opposite pump side if required. 
16. Disconnect mains, motor  and pressure switch cables noting their orientation. 
17. Remove M4 Nut(7) and M4 washer(6) using 7mm deep socket. Remove earth cable from earth 
stud. 
18. Remove interface PCB (15) 
19. Reconnect  Pressure switch cables( PX Switch has no polarity ) as per diagram. Ensure cables are 
routed via  Junction box base . 
20. Fit new  PCB interface. 
21. Reconnect Earth cable. 
22. Secure with M4 Nut / washer to 1.95Nm +/- 0.15 
23. Repeat for other side if required. 
24. Reconnect both HE sensors , mains ,motors cables as per diagram. Ensure cables are routed via  
junction box base cable slots and secured with cable ties (22) 
25. Insert Float (26) into inner until it stops, in the same orientation as removed ,ensuring the magnet 
faces the  HE sensor 
26. Insert NRV to stop position. 
27. Repeat above steps for opposite pump side. 
28. Refit Junction box lid  checking no cables  are trapped. 
29. Resecure JB lid screws to hand tight. 
30. Refit Pressure vessel and new vessel washer. 
31. Reconnect couplers  ensuring filter (30) and rubber washers (29) are seated correctly.  

 
 

22 

11 

Reviews: