9
Installation, power connection and first operation of the
appliance must be carried out by an individual with the
requisite qualifications. These heating panels are designed to
be mounted onto ceilings at a height of a
t least 1.8 m above
floor level
and at a distance of
at least 0.2 m from vertical
structures
. There must be
at least 0.5 m of unobstructed air
space
under the heating panel measured from the vertical axes
of the edges of the heating panel to ensure free circulation of
air and to prevent overheating of the unit.
The fixed connection of the heating panel must contain an element allowing its disconnection from the power mains,
able to fully and completely disconnect contacts at all poles.
The power connection must be equipped with a device enabling disconnection from the power source, where the
distance of disconnected contacts is no less than 3.5 mm at all poles.
Colour coding of conductor wires:
•
Brown wire – L – phase
•
Blue wire – N – neutral
•
Yellow wire – PE – ground
The panel must not be placed immediately above an electrical outlet.
If the power connection cable is damaged,
the heating panel must be put out of operation.
Remove dust from the heating panel surface regularly by wiping with a damp cloth without any detergent or solving
agent, or with a vacuum cleaner. Dust must always be removed prior to starting the heating season. The heating
panel must be cold and disconnected from the power source during maintenance.
During the first operation of the heating panel or the first operation in a given heating season, heat the panel
gradually and make sure the heated room is well aired.
Depending on the environment in the heated premises, the colour shade of the panel radiant surface may change.
All repairs must be carried out solely by the manufacturer.
The panel has a
10-year functional warranty
from the date of sale. The warranty does not apply to defects caused
by transport, inappropriate storage, unauthorized installation or any interference to the product structure. The
warranty also does not cover usual wear and tear of the panel or partial changes to the colour of the panel radiant
surface. The purchase receipt serves as the warranty certificate.
ELECTRICAL INSTALLATION
WARRANTY CONDITIONS
L
N
PE
OPERATION AND MAINTENANCE
225 mm
60 mm
60 mm
60 mm
PLACEMENT
For installation in bathrooms use only heating panels with IP44 protection in compliance with IEC 60364-7-701 as
depicted on the image on the right. When installing the heating system in a bathroom, make sure that a person in the
bathtub or shower will not be able to touch the switches or other control elements of the appliance.