background image

-

Shortly press the ON key on the receiver. Both emitter and receiver should go into standby 
mode. 

-

Shortly press the ON key on the receiver. Both emitter and receiver should go out of standby 
mode. 

-

Press the ON key on the receiver for 1 sec. Both emitter and receiver should turn on. 

-

Turn on both emitter and receiver. 

-

Connect the receiver BNC cable output to a 50Ohm load or to an oscilloscope with 50Ohm 
input. Press the CAL key. After 4-5 seconds the red light should turn off. 

Connect the XFVP in a setup as shown below.  
Install new alkaline batteries in the transmitter. Turn on the probe head and receiver, press CAL 
and wait 5 minutes before starting the tests. 

OFFSET Verification

This test can also be performed with a short at the SMB probe input connector.  

1) Set the voltage source to 0V. 
2) Measure the voltage of the voltage source with the multimeter in the mV scale. 
3) Connect the voltage source to the probe head with the BNC/SMB adapter. 
4) Connect the output of the XFVP to the multimeter using the 50Ohm terminator and the 

BNC to jack adapter. 

5) Press the CAL button in the XFVP receiver. 
6) The offset is the difference between the voltage measured at the voltage source and the 

voltage measured at the output of the XFVP probe * 10. 

BR-XFVP-Rev 6. 12/22

www.saker-mv.com

Summary of Contents for XFVP10-2

Page 1: ...User Manual XFVP Medium Voltage Fiber Isolated Voltage Probe Revision 6 BR XFVP Rev 6 12 22 www saker mv com...

Page 2: ...l accuracy as compared to other optical equipment and saves lots of setup time during research and testing Moreover the XFVP probe can do hot calibrations with no input disconnect which translates int...

Page 3: ...can be floated at very high voltages please consider all clearances before making any measurements Do not open the probe head or receiver they do not contain user serviceable parts inside Fiber cable...

Page 4: ...0 65 C Operating temperature receiver 0 70 C ESD EMI standards IEC61000 4 2 61000 4 3 CE certi cation GPSD 2001 95 EC EMC Directive 2014 30 EU RoHS2 2011 65 EU 1 Specs for XFVP20 model 2 3dB small si...

Page 5: ...mination is needed to provide appropriate high frequency transmission of the signal If the oscilloscope does not have internal 50 termination an optional BNC terminator code XFVPTERM can be supplied I...

Page 6: ...of IEC EN 61010 031 RECEIVER OSCILLOSCOPE CONNECTION A BNC BNC cable is supplied to connect the receiver to a measuring oscilloscope Use of a good quality cable is recommended as it could affect the m...

Page 7: ...ead or the receiver press the TURN ON button until the ON Led lights It takes a short press to turn on the units If the probe head fails to turn on check if the batteries are dead and replace them The...

Page 8: ...emitter It is recommended to use this feature every time the probe is not in use even for shorts periods of time Since the probe head can be set into low power mode remotely from the receiver potenti...

Page 9: ...boots since these protect the connectors from dust and maintain the necessary alignment for proper accuracy CALIBRATION Calibration is needed to adjust the analog parameters of the fiber optic link a...

Page 10: ...icator on the measured line that provides visual and clear indication about the presence of potentially dangerous voltages SAKER offers the MVD and MVDZ series of medium voltage presence detectors LOW...

Page 11: ...n cleaning the exterior Dry the probe before making any voltage measurements The probe is not waterproof The fiber cables should never be disconnected The boots in the cables protect the connectors fr...

Page 12: ...m verification Bench Multimeter of at least 5 5 digits AC and DC accuracy better than 0 1 Keysight 34450A or similar Adjustable power supply or precision voltage source Banana to BNC cable Pomona 4531...

Page 13: ...ne batteries in the transmitter Turn on the probe head and receiver press CAL and wait 5 minutes before starting the tests OFFSET Veri cation This test can also be performed with a short at the SMB pr...

Page 14: ...cking generator and at least 1GHz capability 1 Set the output level of the tracking generator to 5dBm 2 Set the horizontal sweep from 1MHz to 500MHz log sweep 3 Place a jump cable from output of track...

Page 15: ...tic Emissions IEC EN 55011 A1 2011 Radiated Emissions 30 1000 MHz Class B Electromagnetic Immunity IEC EN 61000 4 2 2010 Electrostatic Discharge 4 kV contact 8 kV air IEC EN 61000 4 3 2007 RF Radiated...

Reviews: