- 7 -
Figure 2-4
④
Fixing eSolar MeterS-485(DIN 35mm mounting)
There are buckles at the bottom of the meter. Buckle it on to proper grooves for
tighten.
⑤
CT Installation
CT can be opened. Push the buckle by the side to open the CT. Penetrate the live
wire of the power grid through portal of terminal P1. Tighten up the CT buckle.
(Note: The arrow direction show in the CT should point to the load.)