STEP 2:

Separate the switch base from the knob operator by unlocking lever (1). 

STEP 3:

Strip AC wires back about 3/8”. Route wires through knockout/strain relief.

STEP 4:

Connect ground wire to ground terminal (1).

STEP 5:

Connect AC line wires to the switch. Follow local electrical codes for proper 

AC wire routing: 1 and 2 are neutral, 3 and 4 are hot.

STEP 6:

Attach the switch back to the AC cover and reattach the AC cover into the 

Control Panel.

sageglass.com/resources

STEP 1:

Loosen screws (1) and AC cover (2) (do not need to remove screws). Slide AC 

cover towards controllers and then remove to gain access to switch and 
ground terminal. Remove dust cap over controllers (not shown).

CONTROL PANEL WIRING - AC CIRCUIT

Only a qualified electrician can install the AC side of the panel.

FIGURE 6: AC CONNECTIONS

1

FIGURE 7: SWITCH CONNECTIONS

1

3

2

4

FIGURE 5: SWITCH DISCONNECTING

1

FIGURE 4: AC COVER REMOVAL

1

2

Summary of Contents for SageGlas 300-1176-001

Page 1: ...s SMALL PANEL LARGE PANEL Panel Size Part Number Box Dimensions Weight Controllers Max IGUs Max Sq Ft Voltage Max Power Watts W Width Length Depth Small 300 1176 001 14 5 13 5 2 2 12 lbs 1 16 800 99 253 350 Large 300 1177 001 17 5 36 0 4 2 32 lbs 1 16 800 99 253 350 Large 300 1177 002 17 5 36 0 4 2 38 lbs 2 32 1600 99 253 700 Large 300 1177 003 17 5 36 0 4 2 43 lbs 3 48 2400 99 253 1050 Large 300 ...

Page 2: ...r it might impair the protection provided by the equipment 2 Control Panels can be placed in plenum or wall areas within a conditioned space Control Panels must attach to a mounting surface that can support a fully assembled Control Panel s weight Control Panel can be installed in both vertical and horizontal orientations to include floor mounted Mounting the unit overhead panel cover facing down ...

Page 3: ...NSTALLATION STEP 1 Mark the four holes for placement and drill mounting holes Use mounting tabs or drawing dimensions to mark holes prior to drilling STEP 2 Use the appropriate screws provided by SageGlass to mount the enclosure securely Insert the screws through the enclosure s mounting holes into the mounting surface If screw anchors are required install them in the wall prior to mounting 215 9 ...

Page 4: ...4 are hot STEP 6 Attach switch back to the AC cover and reattach cover onto the Control Panel sageglass com resources STEP 1 Using 8mm socket remove two nuts 1 keep to reinstall AC cover and then pull AC cover 2 out of panel Remove dust cap over controllers not shown CONTROL PANEL WIRING AC CIRCUIT Only a qualified electrician can install the AC side of the panel FIGURE 6 AC CONNECTIONS FIGURE 7 S...

Page 5: ...re Frame Cables or 8 Conductor Cables according to wire color code guide 2 that is on stickers above and below controller CONTROL PANEL WIRING DC CIRCUIT FIGURE 8 CONTROLLER LABELING FIGURE 9 TERMINAL CONNECTION Refer to appropriate row of wire color code guide depending on the cables that system is equipped with and follow the color code FIGURE 10 CONTROLLER CONNECTION CONTROLLER NUMBER LOCATION ...

Page 6: ...l hold one set If system is equipped with mixed cable types 8 Conductor Cables must go to adjacent terminal blocks i e J1 and J2 4 Wire Frame Cable should be connected to one terminal block and 2 Wire Frame Cable into terminal block according to the color code 2C 4C 8C FIGURE 11 2 WIRES 2C 4C 8C FIGURE 12 4 WIRES 2C 4C 8C FIGURE 13 8 CONDUCTOR CABLE 2C 4C 8C FIGURE 14 MIXED WIRES STEP 3 Feed Ether...

Page 7: ...ions to mark holes prior to drilling STEP 2 When unpacking and mounting the Control Panel Large it is required to have two people lift and carry the unit for safety due to fully assembled weight Use the appropriate screws provided by SageGlass to mount the enclosure securely Insert the screws through the enclosure mounting holes into the mounting surface If screw anchors are required install them ...

Page 8: ...EP 6 Attach the switch back to the AC cover and reattach the AC cover into the Control Panel sageglass com resources STEP 1 Loosen screws 1 and AC cover 2 do not need to remove screws Slide AC cover towards controllers and then remove to gain access to switch and ground terminal Remove dust cap over controllers not shown CONTROL PANEL WIRING AC CIRCUIT Only a qualified electrician can install the ...

Page 9: ...re 8 displays a close up of the controller labeling and the corresponding information in an example wiring diagram Consult project specific wiring diagram for all cable terminations Four controller configuration is shown in the following figures J1 1 RED RED BLACK BLACK J1 3 WHITE J1 4 GREEN J1 1 J1 2 J1 3 J1 4 J2 1 J2 2 J2 3 J2 4 J2 1 BROWN J2 2 GRAY J2 3 BLUE J2 4 YELLOW RED BLACK WHITE GREEN BR...

Page 10: ...inal block can hold two sets If it is 8 Conductor Cable 8C row of wiring guide is used It will have two of each set and mount to the adjacent terminal blocks i e J1 and J2 If it is 4 Wire Frame Cable 4C row of wiring guide is used One set will be red black white and green Each terminal block will hold one set If system is equipped with mixed cable types 8 Conductor Cables must go to adjacent termi...

Page 11: ...eglass com fieldoperations sageglass com 877 724 3321 SageGlass is the pioneer of the world s smartest dynamic glass Electronically tintable SageGlass tints or clears automatically to optimize daylight levels while preventing heat and glare without the need for blinds or shades SageGlass delivers superior comfort enhances occupant well being and saves energy As part of Saint Gobain SageGlass is ba...