17
2.
Make sure the emergency stop buttons are pushed in (off) and the remote cord toggle switch is in the
center (off) position.
3.
Use the recommended start settings chart to adjust machine for the type of insulation you are using and
particular operation.
4.
Air flow rate may be controlled with the air bleed control valve
10
while monitoring system pressure on
the air gauge
11
. The system back pressure must be read while the Volu-Matic 100 machine is operating
with full length and proper hose while material is being blown.
Always start the adjustment with the air bleed control valve in the fully closed position. If the air flow and
pressure deliver the desired results with the valve closed, then do nothing to the valve. As you begin to
open the valve, air is bled off from the exit of the blower preventing flow of all air to the airlock feeder. As
you begin to open the valve, be careful to not open completely during open blow or the blowing hose
could clog because of insufficient air volume.
CAUTION: as you open the valve, be careful not to open completely during open blow or the blowing
hose could clog because of insufficient air volume.
10
11
Summary of Contents for CertainTeed Volu-Matic 100
Page 12: ...12 Operation...
Page 20: ...20 Troubleshooting...
Page 23: ...23...
Page 24: ...24 Preventive Maintenance...
Page 30: ...30 Parts Drawings...
Page 31: ...31...