4. Placing into service
4.1. Procedure before use
13
4.2. Commissioning cycle and water topping-up
13
5. Operation
5.1. Operating temperature
14
5.2. Two-level charge
14
5.2.1. Normal charge
14
5.2.2. Fast charge
14
5.2.3. Maintenance charge
14
5.2.4. Recommended charging method
15
5.3. Discharge
17
5.3.1. Discharge current
17
5.3.2. Voltage in discharge
17
6. Maintenance
6.1. Periodic maintenance
18
6.2. Topping-up operation
18
7. Repair and overhaul of batteries
7.1. Electrolyte specific density
19
7.2. Reconditioning
19
Appendix 1 STM 5-100 MR G RD equipped
20
Appendix 2 STM 5-100 MRE G RD equipped
21
Appendix 3 STM 5-140 MR G RD equipped
22
Appendix 4 STM 5-140 MR D RG equipped
23
Appendix 5 Accessories for the central filling system
24
Appendix 6 Basic specification for filling circuit hoses
25
Appendix 7 Basic specification for the cooling system hoses
26
Appendix 8 Basic specification for rigid connections
27
Appendix 9 Basic specification for distilled
or demineralized water
28
Summary of Contents for STM 5-100
Page 1: ...Technical manual installation operation and maintenance for Ni Cd STM MR MRE monoblocks type ...
Page 23: ...Appendix 1 20 Monoblock STM 5 100 MR G RD equipped Positive left Filling right ...
Page 24: ...21 Appendix 2 Monoblock STM 5 100 MRE G RD equipped Positive left Filling right ...
Page 25: ...Appendix 3 22 Monoblock STM 5 140 MR G RD equipped Positive left Filling right ...
Page 26: ...Appendix 4 23 Monoblock STM 5 140 MR D RG equipped Positive right Filling left ...