9/45
2. UNPACKING AND INSPECTION
Each module is packed separately. The BMM, connection kit and documentation are packed
together.
Check the packing material for any damages before accepting delivery from the carrier. If there
is
any sign of damage, report it to the carrier and to SAFT and make a “certified letter with
acknowledgem
ent” to the transporter.
For each battery system, ensure that the following parts are delivered:
9 Synerion 48E modules / 48V nominal / 45Ah: P/N 774842-00
Figure 1: Synerion 48E module
1 BMM: P/N 776354-01
Figure 2: Battery Management System