
SAFIRE 3200B AND 3800A FUEL OIL HEATER
INSTALLATION, OPERATION AND MAINTENANCE
WALL SLEEVE INSTALLATION
WALL SLEEVE:
When using wall sleeves, the combustion air must be led through a wall sleeve from the outside as well.
1.5
TANK, TANK CONNECTION, PUMP
December 2014
SF-LÄMMITIN OY Tilhenkatu 1 20610 Turku Finland Tel./Fax 02-2443282
1. Make a ø90 mm hole to the wall, whose
midpoint is at a height of 225 millimetres from the
bottom of the heater.
2.
Stretch the air pipe (2)
in accordance with
the wall thickness, and install it.
3. Attach the interface box (3). Flue gas pipe
height: midpoint 225 mm from the bottom of the
heater.
4. Cut the vent pipe (4) to a suitable length and
fasten it with a clamp (12).
5. Install the overlong flue gas pipe (5) with a
fastener (6).
6. Install thermal insulation (7) of suitable length
around the flue gas pipe.
7. Mount the heater.
8. Remove the housing (10) and diffuser (9) from
the frame of the funnel. The housing can be
removed by lifting its upper part approx. 4 mm.
Attach the frame (8) of the funnel to the wall. Seal
with silicone compound in order to keep water
outside the wall structures. Fasten the topmost
mounting screws (11) temporarily.
9. Cut the flue gas pipe to a suitable size (see
drawing: 12 mm out of the funnel frame)
10. Mount the diffuser (9) of the funnel and the
housing (10). You will have to loosen the topmost
mounting screws for this.
1 HEATER
2 THERMOSTAT TEMPERATURE SENSOR
3 FLUE GAS PIPE
6 PUMP
7 TANK
8 FILTER
9 BATTERY
12 FLUE GAS WALL SLEEVE
14 THERMAL INSULATION