background image

HOW TO INSTALL

Remove gauge glass assembly and nipples replac-
ing nipples with two 6" brass nipples provided 

.

Install 1/2" x 1/2" x 3/8" tee 

on top nipple.

Install 1/2" x 2" brass nipple 

and 1/2" x 1/2" x

1/2" tee 

to 1/2" threaded hole in casting 

Note: Casting is designed for either left or right
mounting on gauge glass. Be sure to plug hole on
opposite side.

Thread tee attached to casting into bottom 6" nip-
ple. Tighten until casting is vertical.

Install compression fittings 

into casting and

top tee. Size copper tubing 

and tighten

between the two compression fittings.

Attach control to probes using No. 8-32 self tap-
ping screws provided. Install nipple and
blow down valve (with discharge line) in bottom
3/4" tapped hole.

Reattach gauge glass cocks and gauge glass into
end of 1/2" tees. Pressure-trol can be threaded
into 1/8" threaded hole on top of casting. If pres-
sure-trol is not used, plug 1/8" hole on top of
casting.

Attach blue probe lead wire to upper probe and
white probe lead wire to bottom probe with wing
nuts and lock washers provided.

1

2

3

4

5

6

7

MODEL - COMES WITH:

➀ 

(2) 6" x 1/2" brass nipples

➁ 

(1) 1/2" x 1/2" x 3/8" tee

➂ 

(1) 1/2" x 1/2" x 1/2" tee

➃ 

(1) 2" x 1/2" brass nipple

➄ 

(1) 724C manifold casting

➅ 

(1) 3/8" copper tube

➆ 

(2) 3/8" compression fittings

➇ 

(1) 3/4" nipple

➈ 

(1) Blow down valve 

NOTE:

Discharge line

not included. 

2

Reviews: