safgard 1100 Instructions Download Page 3

WIRING TO 24 VAC TRANSFORMER

For boilers using a standard 24 VAC transformer

BOILER SPECIFIC MODELS AND WIRE HARNESSES

Connect RED wire to 

hot 

side of 24 Volt boiler trans-

former 

(R). 

Connect WHITE wire to common side of

24 Volt boiler transformer 

(C).

Connect the GREEN

wire to any suitable, unpainted ground screw. 

Note:

for operation of the control, the green wire

must be connected to a ground source electrically
common with boiler ground.

Cut-off the connectors and strip the ends of the two
yellow wires of the Model 1100 harness. Break into
the burner circuit between the 

hot 

side of the trans-

former 

(R)

and other limit controls. Connect either

YELLOW wire to the 

hot 

side. Connect the other

YELLOW wire in series with other limit controls. 

Important: 

The switch contacts of the low water cut-

off (yellow wires) must be wired in series with all
other limit and operating controls (as shown above).

Step 

���

Step 

���

1100H2

Including 45-348 Harness

Part No.

Model

Description

45-1100

1100

1100 with standard wire harness (cable 45-531-54)

45-1102

1100H2

1100 with wire harness for UTC intergrated control module 
(cable 45-348)

45-1103

1100H3

1100 without wire harness

45-1105

1100H5

1100 with wire harness for Weil McLain Ultra, Lochinvar 
Knight & Solution (cable 45-349)

45-1107

1100H7

1100 with wire harness for connection to vent damper plug on
boiler control (cable 45-353)

Note:  Wire Harnesses are also sold separately (use cable part numbers above)

Reviews: