background image

6

INSPECTION RECORD

Product Code

Date of Manufacture

Serial or Batch No.

Date of Install

Inspector

Date of Inspection

PROCEDURE

INSPECTION

USER

COMPETENT 

PERSON

7.3.1

Attachment point - inspect for damage, deformation, 
corrosion or signs of over loading.

Comments:

7.3.2

Fall Indicators - inspect tabs are intact.

Comments:

7.3.3

Screw Surface - inspect for damage, deformation, 
corrosion, signs of over loading twisting buckling.

Comments:

7.3.4

Energy Absorber- inspect the serpentines lay flat and 
inline with the product. Inspect the energy absorber 
is free of cracks, dirt, debris, defects, damage, 
deformation, corrosion, signs of over loading.

Comments:

7.3.5

Markings - inspect all markings are present and 
legible. Figure  10.

Comments:

Figure 8 

Summary of Contents for TempLink 5000

Page 1: ...structures as specified in the installation manual for each product All safety procedures must be complied with in accordance with the current safety code s of practice s for working at heights in your region Ensure safety at all times by being attached to suitable anchor points and approved safety equipment or approved scaffolding Installation is to be carried out by or under the supervision of a...

Page 2: ...e fall clearance In Figure 2 A represents the deflection TempLink 5000 300mm Max B represents free fall energy absorber deployment as well as the estimated D ring side of the harness Refer the manufacturer s information SF represents the recommended safety factor of 1m FC represents the total allowable fall clearance For safe use FC shall always be greater than A B SF Figure 2 Figure 3 B A SF FC 3...

Page 3: ...ing which has another connector attached 2 In a position that will apply load to the gate mechanism 3 By passing the connection through the attachment 4 Connecting a connector to another connector 5 Around a structure and back to the lifeline 6 To an attachment that will limit the function of the gate 7 To a location that will not load the connector as designed 4 2 Compatibility of Connections Con...

Page 4: ...trength of the structure Structure shall be accordance with local building codes Steel purlins shall be a minimum of 150mmx1 5mm Timber rafters shall be minimum 90x35mm with 70x45mm battens MGP10 or F7 3 Remove the existing roof sheeting screws in the area where the anchor is to be installed 4 Place the anchor on the roof and install a minimum of 5x 14 gauge screws through the mounting holes in th...

Page 5: ... Cleaning The TempLink 5000 may be cleaned by the end user periodically to increase service life After cleaning the product shall undergo the pre use inspection Clean with a rag and warm water to remove dirt and grit A mild detergent may be used to remove grease or oils from the product Do not store this product when wet Allow the product to dry and conduct a pre use inspection prior to returning ...

Page 6: ... 3 2 Fall Indicators inspect tabs are intact Comments 7 3 3 Screw Surface inspect for damage deformation corrosion signs of over loading twisting buckling Comments 7 3 4 Energy Absorber inspect the serpentines lay flat and inline with the product Inspect the energy absorber is free of cracks dirt debris defects damage deformation corrosion signs of over loading Comments 7 3 5 Markings inspect all ...

Page 7: ...rgy absorber and PPE TempLink 5000 Single person Fall Arrest Anchor Complies with AS NZS 5532 2013 and EN795 2012 Multi directional 360 degree use Always read instruction handbook prior to use Fixing of TempLink 5000 1 Remove five 5 existing roof screws along the timber batten or purlin line at the location for the anchor 2 Position the TempLink 5000 to line up with the existing roofing screw hole...

Page 8: ...rees to making good any such defects by repairing the same or at the Company s option by replacement for a period of 1 one year from the date of shipment This limited warranty applies provided that a defects have arising solely from faulty materials or workmanship b the Products have not received maltreatment inattention or interference c the Products have been installed in accordance with the Com...

Reviews: