DRAWING LIST
Flow Chart – Running Mode
Page 49
Flow Chart – Operator Mode
Page 50
Flow Chart - Supervisors Mode
Page 51
Flow Chart – Engineers Mode
Page 52
Flow Chart – QA Operator Mode
Page 54
Flow Chart – QA Inspector Mode
Page 55
Flow Chart - Auto-setup Routine
Page 56
Flow Chart – tm1 Timer
Page 57
Flow Chart – tm2[G]
Page 58
Flow Chart – tm3[G]
Page 59
Typical Metal Detector Conveyor System
Page 60
Summary of Contents for STANDARD SERIES
Page 11: ......
Page 22: ...Figure 6C Cable Gland Assemblies for Power Supply Unit Page 9A...
Page 23: ...Figure 8 Bearing Block Insulation Figure 7 Roller Shaft Insulation one end only Page 9B...
Page 24: ...THIS PAGE IS LEFT BLANK INTENTIONALLY Page 9C...
Page 25: ...Page 10...
Page 26: ......