Car lift installation, operation and maintenance manual
Type:4SF-4000C
21
Mobile group components
Installation of mobile unit on the whole machine
The function of the mobile kits is as follows
:
A:The only function of the mobile kits is to move the whole machine.
B:When lifting the vehicle, the moving group assembly must be removed, and the whole machine is secured with expansion screws.
Step 20
:
Install the oil pan and tools.
Attention
:
1.The above steps are all the installation steps of the four column parking
,
2.SAFE is committed to continuously improve product quality, update technical specifications, subject to change without notice.
3.4 Check the items after installation
1
The upright post is perpendicular to the ground
2
Tubing connections are in place
3
The wire rope is connected in
place
4
The main and auxiliary lifting bridge installed in place
5
The electrical connection is correct
6
Fastening of other parts
7
The part that needs lubrication is lubricated
Mobile kits
Tool tray
Ring
Spring card
M10 nut
M10 Spring washer
M10 Flat pad
Caster
M10*35 six angle screw
Column
bridge plate Before and after blocking
Spring card
Ring
Mobile kits
Pan