PRIME DESIGN, A SAFE FLEET BRAND
▪
Address: 1689 Oakdale Avenue #102, West St Paul, Minnesota 55118
▪
Toll Free: 1.8.PRIME.RACK
▪
Fax: 651-552-1799
▪
Email: [email protected]
▪
Website: www.primedesign.net
TM & © 2020 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6427889, 6764268, 6971563, 8991889, 9415726, 9506292, 9481313, 9776476, 9796340, 10470565, 10486608 AND OTHER PATENTS PENDING
10
5
8
7
6
VRR3-FT21G-ST BO
X
ASSEMBL
Y INSTR
UCTIONS
10
Remove the Quick Start Guide found
inside the Ship Thru Box, and place
it into the vehicle’s glove box for End
User ladder setup and adjustment.
QUICK START GUIDE
LEFT SIDE INSTALLATION SEQUENCE
5
Repeat steps 1.1
-
1.4 to install
the left side Rear Slide L Post.
6
Repeat steps 2.1
-
2.4 to install
the left side Rear Slide Z Post.
7
Repeat steps 3.1
-
3.5 to install
the left side Front L Post.
9
Close the Left Hand Rotation.
8
Repeat steps 4.1
&
4.2 to install
the left side Front Z Post.
Replace the Ratcheting Handle into the
cargo hold of the vehicle immediately
upon completion of this rack build.
Installer’s Note:
Open the Left Hand
Rotation to install the L and Z Posts.
Summary of Contents for PRIME DESIGN VRR3-FT21G-ST
Page 1: ......
Page 11: ...Page Intentionally Left Blank...