background image

1852-37:  4 of 4;  Rev. 1; 05/03

Install the drawer: lift the back rollers on the Drawer
Rails over the front rollers on the Cabinet Rails, tilt
the drawer enough to start the drawer moving, and
lower the drawer to push it all the way into place.

With the special

AA

  Drawer Screws, fasten one of

the  Z  Drawer Sides to the

BB

 Drawer Back and the

DD

  Inner Drawer Front, making sure all grooves face

the drawer center.  Carefully slide the

CC

 Drawer

Bottom into the grooves.

8

Now fasten the other  Z  Drawer Side, with four

AA

Drawer Screws.

9

Attach the

EE

 Outer Drawer Front to the drawer by

inserting

FF

 7/8” Washer Screws through the inner

Drawer Front and into the Outer Drawer Front (use
the OUTER set of holes). Next, attach the  T  Handle
to the drawer by inserting two

GG

  1-1/2” Screws

through the inner Drawer Front, the Outer Drawer
Front and into the Handle (use the INNER set of
holes). Tighten securely.  Attach the  X  Left Drawer
Rail and the  Y  Right Drawer Rail to the drawer
sides with the rollers toward the back, using three
G  1/2” Flat-head  Screws each.

10

11

GROOVES

BB

DD

CC

HOLES

N O

HOLES

ROLLER

AA

Z

Z

AA

FF

GG

EE

G

Y

T

X

Insert two  V  Shelf Pegs into the small interior
holes on the left and right side panels, all on the
same level (See 

inset

). Tilt the  W  Adjustable

Shelf and insert it between the doors. Position the
shelf onto the Shelf Pegs.

12

W

inset

V

Reviews: