PREPARATION
*Before beginning assembly of product, make sure all parts are present. Compare parts with part contents list and hardware contents list.
*If any part is missing or damaged, do not a�empt to assemble the product.
*Es�mated Assembly Time: 90 minutes.
*Tools Required for Assembly (included): Allen Key
*If you are having difficulty, our friendly Customer Care team is always here to help. Please email
12
I
1
3
H
3
6
PM2
B
2
B
H
4
Styrofoam pad
9
E
F
B
STEP5
: Insert Cambolt (HW1) and Dowel (HW3) into Front Skirt (I).
A�ach Mini Block (HW12) into Front Skirt (I) by gently knock it using
hammer.
STEP6
: Insert Dowel (HW3) into Bo�om Board (B). Install Moun�ng Plate
(PM2) and secure with Screw M4.5x12.5mm (HW6).
Step7
: A�ach Bo�om Skirt (H) into Bo�omBoard (B). Insert Camlock
(HW2) then �ghten using screwdriver
Step8
: Use styrofoam from the packaging material to elevate the bo�om
board (B) from the floor. Insert Center Boards Le�&Right (E&F) as figure.
Put Bo�om Board (B) and secure with Screw M7x50 mm (HW4),�ghten
screws using Allen Key (HW9).