2
English
5
3
1
6
4
7
8
9
2
MAIN PARTS
1
Brew group and coffee grinder
2
Brewing hopper group
3
Sugar and stirrer dispensing group
4
CPU card
5
Cup dispenser
6
Payment system area
7
POWER card
8
Water circuit equipped with air-break
device
9
Pump
10
Tray socket
11
Data plate
12
Data plate showing the minimum and
maximum water pressure
13
Water mains connection
11
10
12
13
Summary of Contents for ESPRESSO SG200E
Page 53: ...53 English ALIGN THE TWO ARROWS ALIGN THE FIVE SCROLLS REFERENCES fig 62...
Page 63: ...63 English Notes...
Page 64: ...64 English Notes...
Page 65: ...65 English Notes...
Page 66: ...66 English Notes...
Page 67: ...67 English Notes...
Page 68: ...Cod 1813 956 ED01...