002AZ001A
4 - 7
INSTALLATION
4
T2500
T1589
4.3.3
HOOKING UP THE COOLANT SYSTEM
(References given in figure 4.3.3)
- Connect zones A and B of the temperature regulator by using two pairs of tubes (1" diameter) to the press (4), as
shown in the figure.
- Connect zone C of the temperature regulator (1) to the distribution block (5) mounted on the hydraulic power unit (2)
using a pair of tubes (1" diameter).
- Connect the distribution block (5) to the extruder (3) with the related delivery and return tubes (D).
Figure 4.3.3 - HOOKING UP THE COOLANT SYSTEM
1
Temperature regulator
2
Hydraulic power unit
3
Extruder
4
Press
5
Distribution block
AM
Delivery line
AR
Return line
BM
Delivery line
BR
Return line
CM
Delivery line
CR
Return line
DM
Delivery line
DR
Return line
5
2
1
4
D
5
4
1
3
D
R
D
M
C
M
C
R
D
R
D
M
B
R
B
M
A
R
A
M
T2531
T1579
1
C
B
A
3
4
2
A
M
B
M
C
M
B
R
A
R
C
R
T2509
5
Summary of Contents for CCM001
Page 2: ...002AZ001A 0 2 TABLE OF CONTENTS...
Page 4: ...002AZ001A 0 4 TABLE OF CONTENTS...
Page 10: ...002AZ001A 0 10 TABLE OF CONTENTS...
Page 14: ...002AZ001A 1 4 1 GENERAL INFORMATION T2525 1 8 MACHINE IDENTIFICATION PLATE...
Page 50: ...002AZ001A 2 36 2 MACHINE FEATURES...
Page 106: ...002AZ001A 7 20 7 ADJUSTMENTS...
Page 119: ...002AZ001A 8 13 MAINTENANCE 8 T2575 Figure 8 1 2 2 50 kg h EXTRUDER 6 31 33 32 7 8 1 3 17 5...
Page 162: ...002AZ001A 8 56 8 MAINTENANCE...
Page 164: ...002AZ001A 9 2 9 DECOMMISSIONING...