Page # 17
877 1st Ave. N.W. | Sioux Center, IA 51250 | Toll Free: 1.866.722.1488 | siouxautomation.com
OPERATION
REPLACEMENT PARTS
READ complete manual CAREFULLY
BEFORE attempting operation.
877 1st Ave. N.W. | Sioux Center, IA 51250 | Toll Free: 1.866.722.1488 | siouxautomation.com
OPERATION
REPLACEMENT PARTS
READ complete manual CAREFULLY
BEFORE attempting operation.
LUBRICATION
LUBRICATION
•
It is extremely important that the following lubrication schedule be followed:
Bearings: use a good quality
multipurpose grease. Replace all damaged or missing grease zerks immediately. Always clean zerks before using
grease gun. Pump the grease in slowly until a slight bead forms around the bearing seals. Once a month check lines
and connections on grease banks for leaks.
•
Oilbath Oil:
Use a good high quality universal oil. Use an oil that meets or exceeds hydraulic oil grade. Fill to the top
lower oilbath roller chain. Change yearly or whenever contaminated.
•
Before operating a new mixer,
the roller chains should be liberally lubricated and then the unit operated under a
no-load condition. This break-in period will allow the roller chains to be thoroughly lubricated and thus minimize
heat-up during operation.
LUBRICATION
ITEM
LUBRICATION
INTERVAL
CAPACITY
OIL TYPE
LOCATION
1
8 HOURS
HIGH QUALITY MULTI PURPOSE GREASE
FRONT AUGER & REEL BEARINGS
2
8 HOURS
REAR AUGER & REEL BEARINGS
3
8 HOURS
DRIVELINE BEARINGS & UNIVERSAL JOINTS
4
ANNUALLY
WHEEL BEARINGS (REPACK ANNUALLY)
5
20 HOURS
DISCHARGE BEARINGS (IF APPLICABLE)
6
CHAIN LUBE OIL
DISCHARGE CHAINS (IF APPLICABLE)
7
50 HOURS
APPROX. 3.5 GALLONS
GOOD QUALITY HYDRAULIC OIL
OIL BATH OIL (CHECK LEVEL)
REPLACE ANNUALLY
8
6 MONTHS
18 PTS
MOBILE 629 GEARLUBE
PLANETARY
111
5
6
IF APPLICABLE
3
2
4
33
33
7
33
3
4
8
Summary of Contents for TURBO-MAX 6175
Page 46: ......