Page # 16
BAG INSTALLATION
1.) Disconnect the yellow rope with hooks from the bagger’s front shroud. Lower the bag apron
to the ground by using the jack located on the right side of the machin
Figure 1-2
WARNING! ALL WORK TO INSTALL THE BAG SHOULD BE
DONE FROM THE GROUND & BY STEPPING ONLY ON
THE AXLE. DO NOT CLIMB ON THE ROTO-PRESS.
CLIMBING
ON
UNIT
MAY
RESULT
IN INJURY OR DEATH FROM A FALL.
2.) Winch the trolley\bag lift (if so equipped), pulling it along on both sides while standing on
the ground and lower to approximately 3’ off the ground. (Figures 1 & 2) Note: 3 or more people
should be present at this point.
3.) Position the box containing the proper size bag for your bagger behind the bag lift. Making
sure the arrow is toward the machine. Cut the straps around the box and remove the top por-
tion, discard the top half. Unfold the remaining box fl aps. Remove the two (2) blue straps that are
holding the bag together. Leave the rest alone for now. Make sure the black side is toward the
machine. Having one person on each side of the bag, take a fl ap, lift and lay the top half out and
pull the bottom half out so the bag lays fl at. Two (2) people should put their arms between the
top fl aps, put the bag around the bag lift. (Figure 3) Remember to position the bag so the bars
and lettering used to measure the stretch of bag are easily reached (approximately 3’ to 4’ from
ground).
4.) Using the two (2) blue straps cut earlier, lift and place around bottom position of the bag.
Slide the cardboard so that the fl aps will just go up onto the apron. (Figure 3) Then slide the bag
onto the bag apron. Raise the bag lift and roll it forward all the way to the front, sliding the bot-
tom of the bag along onto the bag apron. Slide the cardboard just off of the apron.
%$*$3521
%$*$3521-$&.
5,*+76,'(9,(:
:,7+7,5($1'%5$.(
5(029(')25&/$5,,7<
USING YOUR ROTO-PRESS