
Aprrox 0-0.5mm
M2.5x8mm
NOTE:
Correct Tightening
TAIL BOOM ASSEMBLY
*Install the belt onto the tail front pulley, checking the direction of rotation.
Rotate the belt 90 ° counterclockwise (
Fig. 1
).
*Rotate the main rotor several times by hand.
*Tension the tail belt by pulling the boom back with your hands,
or using the special Tool H1722-S ( Optional )
* When the tension reader shows zero, the belt tension is correct.
===> Tighten the 2 tail boom Screws M2.5x8mm.
TOOL KIT ASSEMBLY (H1772-S)
[H1772-01]
(H1772-S)
Oring
[H1610-04]
(H1772-S)
[H1610-03]
(H1772-S)
Screw M2.5x12
(HC026-S)
[H1772-02]
(H1772-S)
Screw M2.5x10
(HC022-S)
Socket Head Cap
Screw M2.5x10
[HC022-S]
Tighten the Screw
for tension the belt
HOW TO USE THE TAIL BELT TENSION TOOL:
( Not Included KIT. H1772-S)
1. Push the plastic pad into its seat by unscrewing
the orange M2.5x12 screw
.
2. Install the tool on the boom, it needs to touch the H1762 clamp.
3. Tighten
the
pink M2.5x12 screw
to lock the tool onto the boom.
4. Turn
the orange M2.5x12 screw
to tension the tail belt.
This will push the boom back, thus tightening the tail belt.
5. Once the correct tension is achieved
( The correct tension is indicated on the graduated scale between -1 and +1. )
Tighten the two boom clamps with
the
two blue M2.5 screws
.
6. Remove the tool before flight.
Set Screw M3x20
(HC150-S)
NOTE:
Correct Tension
Page 27
TAIL BOOM ASSEMBLY
Summary of Contents for GOBLIN RAW 500
Page 1: ...MANUAL GOBLIN 500...