Open in this area
and use the internal volume.
Use the front area to install the batteries.
It is suggested to use 1 battery for the turbine, 2 batteries for the RX system. and 1 battery for Landing Gear System.
We recommend the most advanced positioning of the batteries to optimize the CG. Option 2 is recommended.
Make sure the batteries are locked in the defined position.
OPTION 1
OPTION 2
Page 19
COMPONENTS