S.R.Smith ROGUE GRAND RAPIDS Assembly And Installation Instructions Manual Download Page 15

 

15

 

23) 

 If necessary the legs can be adjusted up and down within the leg sockets to help 
adjust for level.  Once the slide is properly leveled the legs shall be permanently 
attached by drilling a 1/4" hole into each leg using the hole on the leg socket as a 
guide and fastening with a (#10) 5/16” Hex Head Washer Tek Head Screw.  See 
Figure 22. 

 
 
 

24) 

 Disassemble each handrail as shown in Figure 23.  Insert the two handrails into 
the holes on the top of the slide runway rails, and secure each using a (#21) Flat 
Washer, a (#19) Lock Washer, and a (#20) Hex Nut.   

 

25) 

Starting with the top handrail spacer, align the top hole in the handrail with the 
top hole in the ladder side rail.  Next, assemble the handrail spacer parts (#16), 
(#17) and (#18) in the order shown in Figure 23 and align it between the handrail 
and ladder top holes.  Next, insert the (#15) 1/4-20 x 8” Carriage Bolt through the 
handrail and the handrail spacer parts.  The (#9) Ladder spacer is to be placed in 
between the front and back sides of the ladder side rail such that the (#15) 
Carriage Bolt holds it in place after it is pushed completely through the ladder 
side rail, see Figure 24.  Secure the (#15) Carriage bolt using a (#21) Flat 
Washer, a (#19) Lock Washer, and a (#20) Hex Nut in the order shown in Figure 
23.  Finally, place a (#6) Vinyl Bolt Cap over the exposed threaded end of the 
bolt. 

 

26) 

 For the remaining two ladder spacers, align parts (#16), (#17) and (#18) 
between the hole in the handrail and the hole in the ladder as in step 24.  Use a 
(#14) 1/4-20 x 6” Carriage Bolt along with a (#21) Flat Washer, a (#19) Lock 
Washer, and a (#20) Hex Nut to fasten the parts together as shown in Figures 23 
and 24.  Again, place a (#6) Vinyl Bolt Cap over the exposed threaded ends of 
the bolts. 

Figure 22 

Summary of Contents for ROGUE GRAND RAPIDS

Page 1: ...ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P O Box 400 1017 SW Berg Parkway Canby Oregon 97013 503 266 2231 503 266 4334 www srsmith com 06 67...

Page 2: ...to be installed and used on public in ground pools aboveground pools on ground pools houseboats boat docks floating docks or platforms APPLICABLE STANDARDS AND CODES 1 All S R Smith RogueTM Grand Rap...

Page 3: ...1 151 20 x 6 Carriage Bolt S S 4 ea 15 05 31 149 20 x 8 Carriage Bolt S S 2 ea 16 6 121 Nylon Tube Connector 6 ea 17 6 123 Nylon Handrail Connector 6 ea 18 01 212 Aluminum Handrail Spacer 6 ea 19 5 14...

Page 4: ...2 8 2 8 3 1 3 0 2 7 2 5 2 5 2 6 S L I D EL E G...

Page 5: ...OOLS REQUIRED FOR SLIDE ASSEMBLY PVC glue Silicon sealant Hand drill with Phillips bit Ratchet with 7 16 1 2 and 3 8 sockets 7 16 wrench 1 2 wrench Hammer drill with 1 4 masonry bit Small Level FIGURE...

Page 6: ...the pool wall YOU MUST FOLLOW THE INSTALLATION INSTRUCTIONS AS PRINTED IN THIS MANUAL LEFT CURVE SLIDE WITH FLUSH DECK MOUNTING The purpose of this side view is to serve as a GUIDELINE ONLY for approx...

Page 7: ...all the way into the two sockets in the slide NOTE The top of the ladder is the end with the side rails cut square See Figure 7 4 Insert the slide legs into the leg sockets of the slide The shorter l...

Page 8: ...measured at the point of transition between the runway and the beginning of the exit end radius 8 Ensure that the ladder is not twisted relative to the slide 9 Insert 3 8 diameter rebar not provided i...

Page 9: ...the 3 PVC Union Be sure to push the thread adapter as far as it will go into the union See Figure 10 14 Apply a small amount of silicon sealant to the male thread side of the 3 PVC Union Thread the PV...

Page 10: ...16 Use a drill with a Phillips bit to fasten the 4 Plastic Pipe Clamp to the ladder as shown below in Figure 13a The hose clamp should be attached with the clamp aligned with the bottom of the step S...

Page 11: ...omatically tighten when pressure is applied pushing the hose into the clamps 18 Apply PVC glue to one socket of the 2 PVC Ball Valve and insert the PVC hose into the valve as shown in Figure 15 Allow...

Page 12: ...ogueTM Grand RapidsTM water system has been properly assembled as explained in the RogueTM Grand RapidsTM Installation Instructions Next apply PVC glue around the end of the garden hose adapter indica...

Page 13: ...and lengthwise as shown below in Figure 18 20 Underneath the top portion of the slide on the inside flat surface next to the ladder socket use the existing holes as a template to drill a 1 4 inch hole...

Page 14: ...a 12 5 16 x 7 8 flat washer and a 13 5 16 x 3 4 rubber washer tightening to 8 ft lbs of torque See Figure 20 CAUTION DO NOT OVER TIGHTEN 22 Level as close as possible the exit runway surface horizont...

Page 15: ...nd align it between the handrail and ladder top holes Next insert the 15 1 4 20 x 8 Carriage Bolt through the handrail and the handrail spacer parts The 9 Ladder spacer is to be placed in between the...

Page 16: ...16 Figure 23 Figure 24...

Page 17: ...3 Using the four holes on each flange as a template see Figure 25 below drill four 5 16 holes per flange 1 3 8 deep CAUTION Do not drill holes larger than 5 16 Maintain drill hole straight and perpend...

Page 18: ...20 above the water surface and not less than eight inches 8 above the deck coping surface see Figure 26 B The slide shall be positioned so that all water flowing off the runway exit drops into the poo...

Page 19: ...um clearance area of a slide or diving board shall not intersect any coping or rope and float line See Figure29 The minimum clearance area of a slide or diving board may intersect each other provided...

Page 20: ...the ladder steps rails or attachments means Yield is evidenced by crystallization or fine cracking of the ladder tread and or surface 5 Inspect the ladder handrails for rigidity and attachment Can th...

Reviews: