The discharge pipework from the tundish: 

Must fall continuously through its length. 

Must be of a heat resistant material, e.g. metal. 

Must not be fitted with any valves or taps. 

Must discharge to a safe visible position, e.g. onto the surface of an external wall or into a gulley. 

Must have a minimum of 300 mm straight pipework directly from the tundish. 

Note: Where children may play or otherwise come into contact with discharges, a wire 
cage or similar guard must be positioned to prevent contact whilst maintaining visibility. 
 

The diagrams on this page show recommended methods of routing and terminating the discharge 
pipe safely. Where a single pipe serves a number of discharges, such as in blocks of flats, the num-
ber served should be limited to not more than 6 systems so that any tundish installation can be 
traced easily.  

 

If a single common discharge pipe is used then it should be at least one pipe size larger than the 
largest individual discharge pipe to be connected. If the system is installed where discharges from 
safety devices may not be apparent, i.e. in dwellings occupied by blind, infirm or disabled people, 
consideration should be given to the installation of an electronically operated device to warn when 
discharge takes place. 

 

 
 
 
 

 

 

 

Figure 4 - Discharge Pipe  routing 

 
 
 
 

 

Figure 5 - Tundish installation  

5.2 High Level Termination of Discharge 

At high level, discharge onto a roof is acceptable providing the roof is capable of withstanding high 
temperatures and there is a distance of 3 m from any plastic guttering systems that would collect 
such discharge. 

 

Note: 

The discharge may consist of scalding water and steam. Asphalt, roofing felt and non-metallic 

materials may be damaged by such discharges. 

Tundish

D1

D2

300mm

minimum

Tundish

300mm

minimum

D1

D2

Pipe close to wall to
allow water to fan out
safely

100mm max.
70mm min.

Ground level

Gulley if

available

Tundish

300mm

minimum

D1

D2

Type ‘A’
Air Gap

End of pipe

clearly visible

Option  A

Option B

Option C

Summary of Contents for TML SF

Page 1: ...tance spare parts or service call RVR Energy Technology Limited Kenmare Co Kerry Tel 064 6641344 Fax 064 6689520 LEAVE THESE INSTRUCTIONS WITH THE USER INSTALLATION AND OPERATING INSTRUCTIONS TML SF W...

Page 2: ...nd has been regularly maintained as detailed in these instructions The unit has been used only for heating potable water The unit is NOT guaranteed against damage by frost or due to the build up of sc...

Page 3: ...2000 Max DHW Pressure bar 6 6 6 6 6 6 Max Primary Pressure bar 3 3 3 3 3 3 Max Operating Temperature C 95 95 95 95 95 95 Max design pressure bar 6 6 6 6 6 6 Heating capacity kW 38 3 53 5 68 6 109 8 1...

Page 4: ...nlet q Inspection flange r Recirculation u DHW Outlet w Electric Immersion Heater Lt Ext H tot a e C i u r W q Kg empty Kg full 500 650 750 1730 1 1 1 1 1 120 180 120 620 800 790 990 1810 1 1 1 1 1 1...

Page 5: ...safety devices must be fitted to the unvented water heater Thermostatic control Energy Cut Out Device The normal water storage temperature is 60 C The water heater thermostat should be wired to en su...

Page 6: ...d be carefully calculated A rule of thumb for systems with a cold water supply pressure of 3 5 bars and a maximum heating temperature of 60 C is that the volume of the expansion vessel should be at le...

Page 7: ...y mixing it with cold water as required The delivered water temperature should not exceed 50 C 4 Zone Valve The recommended water storage temperature is 60 C The water heater ther mostat should be wir...

Page 8: ...d expressed as a length of straight pipe Resistance cre ated by each el bow or bend G 1 2 15mm 22mm 28mm 35mm Up to 9m Up to 18m Up to 27m 0 8m 1 0m 1 4m G 3 4 22mm 28mm 35mm 42mm Up to 9m Up to 18m U...

Page 9: ...d be at least one pipe size larger than the largest individual discharge pipe to be connected If the system is installed where discharges from safety devices may not be apparent i e in dwellings occup...

Page 10: ...ermissible resistance for this pipe run 6 0 Installation Electrical Requirements WARNING This water heater must be earthed The water heater is fitted with a control thermostat as shown in figure 6 It...

Page 11: ...ansion vessel should be checked annually Method Switch off power to immersion heater s and shut down boiler Close the Stop Valve Open a hot water tap in order to reduce pressure in the cylinder Remove...

Page 12: ...operly connected Check charge pressure of expansion vessel Open a hot water tap turn on mains water supply to the heater Allow unit to fill and leave hot tap running for a short while to purge any air...

Page 13: ...pansion vessel size and precharge pressure Water supply pressure exceeds 3 5 bar Fit a pressure reducing valve with integral line strainer see section Installation Options Water or steam from Pressure...

Page 14: ...14 Manufacturer details TML 64010 CIVITELLA DEL TRONTO TE ITALY TML Single coil instructions 060510...