background image

PAGE 2

CAM

BOLT

BOLT

NUT

END SWITCH BRACKET

Figure 2

Figure 3

TELESCOPING LEG

FOOT PAD

MICROSWITCH

WASHER

WARNING

Electric shock hazard. Can cause injury
or death. Before attempting to perform
any service or maintenance, turn the
e l e c t r i c a l   p o w e r   t o   u n i t   O F F   a t
disconnect switch(es). Unit may have
multiple power supplies.

CAUTION

Danger of sharp metallic edges. Can cause injury.
Take care when servicing unit to avoid accidental
contact with sharp edges.

1.

Disconnect all power to rooftop unit.

2.

Remove the rooftop return air access panels. Also
remove any hoods and/or power exhaust equipment.
Discard hoods, power exhaust equipment, and return
air access panels.

3.

Verify and/or install an economizer. The ERV will

ONLY

 work with RSI economizers: 

4.

Remove the enthalpy control sensor from the

economizer. Keep enthalpy control sensor. It will be
reinstalled in the ERV.

5.

Locate the provided end switch, cam screw, washer,
bolts, nuts and bracket in box assembly.

6.

Install the cam on the economizer exposed blade pivot 
with shoulder pointing outward by attaching with
provide 10-32 x 1" screw and rubber washer. Position
cam and screw, but do not completely tighten screw.
Next attach switch bracket to economizer end plate
using provided ½" self-tapping screws. Then mount
switch to bracket using the oblong holes with provided
6-32 x 1" bolts and nuts. 

See Figure 2.

 This cam will

trip the end switch S122 when damper rotates. Set the
end switch arm so that it closes when fresh air
dampers are open 50% or greater. Tighten screw to
secure cam.

7.

Locate the provided low voltage field harness. Wire
the field harness to the economizer controls per the
field wiring harness diagram provided in this
installation instructions. Remove the wires that were
connecting the enthalpy control of the economizer and 
replace them with purple and blue wires on the field
wiring harness.

8.

Clean up wiring around the economizer and neatly
route the wires to clear any moving parts.

9.

Route the excess wire of the field wiring harness out
the return air. Coil the excess wire inside the rooftop
unit to clear installation of the ERV.

10. Install side fillter panel to RTU. Secure into place with

provided screws.

11.  Attached platform support rail centered on rooftop unit 

base rail with channel pointing upward.

12. Locate roll of provided ¾" and 

1

8

" gasket material.

Apply ¾" gasket to the middle and bottom decks of the
ERV. Also apply 

1

8

" gasket to perimeter of ERV that

contacts RTU.

13. Using lifting lugs, raise ERV unit approximately three

(3) feet. Remove nut and bolt assembly to slide

telescoping part of leg half way out of guide and attach
flat foot with hardware provided in bag assembly.
Position standoff legs so that flat foot is on bottom of
stand and reinstall nut and bolt assembly. 

DO NOT

fasten tightly, adjustment will need to be made when
unit is put into position. 

See Figure 3.

14. Lift and move ERV  unit into position with open end

in-line with back door panel horizontal openings.

Note:

A treated 2" x 6" x 48" piece of wood or

equivalent equipment support should be used to
under feet of standoff legs to prevent roof
penetration.

15. Lower ERV into platform support rail catching the front

edge of the ERV bottom into the  flange.  With the ERV
in place, adjust the standoff legs to level and support
ERV against rooftop unit side filler panels. Use screws
to securely fasten ERV to rooftop unit. Tighten
securely. Rotate lifting lug to original position and
tighten machine bolts.

Summary of Contents for RRS Rooftop Systems P28 Series

Page 1: ...moisture from the exhaust air stream during one half of a complete rotation and gives them back to the cold drier intake air supply during the other half rotation In summer the process is automatical...

Page 2: ...s per the field wiring harness diagram provided in this installation instructions Remove the wires that were connecting the enthalpy control of the economizer and replace them with purple and blue wir...

Page 3: ...ase of installation and maintenance only matching up to rooftop unit with an internal economizer and connection of electrical power is required to make the system operational The concept consists of a...

Page 4: ...otors damper motor for wheel and dampers it should pivot wheel out of air stream opening fresh air dampers and a delayed exhaust blower will operate 5 Remove jumper s from low voltage terminal block T...

Page 5: ...nstall wheel segments follow steps A through E See Figure 5 Reverse procedure for segment removal A Unlock two segment retainers one on each side of the selected segment opening B With the embedded st...

Page 6: ...04 1 09 1 09 1 09 1 08 1 05 0 99 0 90 0 82 0 75 0 89 0 88 0 87 0 85 0 81 0 75 0 66 0 59 0 5 0 69 0 68 0 65 0 62 0 57 0 5 0 42 0 35 0 25 0 00 0 20 0 40 0 60 0 80 1 00 1 20 1 40 1500 1600 1700 1800 200...

Page 7: ...Air Motor Harness J150 Jack Wheel Motor Harness J151 Jack Exhaust Air Motor Harness J152 Jack Transformer High Voltage J153 Jack Field Harness J160 Jack Damper Motor J193 Jack Enthalpy Sensor K163 Co...

Page 8: ...move jumper to install field optional low ambient switch 2 Step down transformer assembly for 460 575 volt units only connect between J50 and P50 3 Move wire for different input voltage 4 Optional low...

Page 9: ...PAGE 9...

Page 10: ...PAGE 10 PLATFORM SUPPORT RAIL TOP FILLER PANEL SIDE FILLER PANEL...