Section 3 - Installation
© Rugged Interactive
2019
3.4
–
Detailed Installation
Read this manual before installing the CardioWall.
Installation Guidelines:
▪
Please complete the
Site Survey
form prior to delivery and/or installation.
▪
Please send a completed
Installation Checklist
after any installation to Rugged Interactive.
▪
A typical installation should take 2 people about 2 hours.
▪
No obstructions or protrusions in the installation area: e.g. skirting boards, pipes, cables and wiring
conduits.
▪
Avoid trapped and/or pinched cables.
▪
Use good practice when running data cables to and from products, external pods and sensors. Support
long cables at least every 50 cm and provide adequate strain relief for connection points.
▪
Power supply to be within 100 cm of each CardioWall. Standard power cables are positioned bottom
right.
▪
To prevent electric shock, keep all electric components away from contact with water.
▪
IMPORTANT: Take anti-static precautions.
Structure:
▪
The units must be mounted to a flat/level construction capable of supporting its weight and gameplay.
(Uneven walls and surfaces make alignment and fitting very difficult.)
▪
The wall area for installation will need to exceed the width and height of the CardioWall (refer to
System Specifications) plus an additional 10 cm of clear space around each edge. If two CardioWalls
are being positioned side-by-side, leave a gap of 150 cm - 300 cm.
▪
Typical suitable construction would be block built, portal frame with structural infills or brick built.
▪
Alternatively, mount onto 18 mm plywood (12 mm minimum) mechanically mounted to a steel
framework (50 mm box minimum). Preferably, the plywood should be painted prior to installation.
▪
Adequate holes will need to be cut during installation to provide clearance for cable access to rear if
required.
▪
Do not fix to plasterboard faced partition. Avoid stud walls or unsupported portal infills.
Fixings:
▪
The manufacturer will supply fixings.
▪
Use hex-headed screws of 50-70 mm length (2”) x M10 for a plywood structure.
▪
Use Rawl Plugs (plastic wall plugs) if mounted to a solid block or brick wall.
▪
10 x 35 ‘penny’ washers to spread the load at each bolt head are recommended.
▪
All fixings must be tight and secure.